# August 2026 Newsletter - Eco Beach City

August 2026: the master plan map redrawn with every common area, current and future; the free glamping upgrade going in; and an open door for every owner to come and stay.

Source: https://ecobeachcity.com/newsletter-august-2026

August Newsletter

A new map · The free upgrade going in · The door is open to every owner

August was the month this place stopped being a plan and started being used.

Not by us. By the people staying here. The photographs in this letter arrived from guests and from the team on site, taken over the past few weeks: a padel match that ran past sunset, a terrace nobody wanted to leave, two scooters parked outside a camp with the sky doing what it does here every evening at six. None of it was staged for a newsletter.

Three things happened worth writing down: the map was redrawn, the free upgrade to the glamping units began going in, and we opened the door to every owner, whether they have built anything or not.

## The Glamping Upgrade Is Going In

Solid timber walls, fitted to every glamping unit, at our cost. Nobody asked for it and nobody is paying for it.

The specification went up while the units were being built. Fixed timber walls in place of fabric, on every unit, for every owner, with nothing asked in return and nothing added to any invoice. A canvas wall is beautiful for a season. A timber wall is a room you can lock, leave, and come back to a year later and find exactly as you left it.

They are going in one unit at a time, because each set of walls is cut and fitted by hand on site rather than delivered ready-made. If yours is not finished yet, it is in the queue, and it will be handed over with walls it was never going to have when you bought it.

The second photograph is the other half of it. For the owners who took the furnishing package, the furniture is on site and going in unit by unit: beds, wardrobes, the whole interior, delivered in flat packs and assembled in place. Air conditioning follows in the coming weeks, and where an eco bathroom or dry toilet was ordered, it is already on its way.

Both photographs were taken on 29 August 2026. We publish work in progress as work in progress, dated, rather than wait for the tidy version.

## A New Map Of The Commons

Every common area on the estate, the ones open today and the ones still to come, on one interactive plan.

The map has been rebuilt from the ground up. You can zoom into the districts, search for a place by name, filter by the kind of life you are after, and open any pin to read what is there. What it will not do is flatter us.

Everything on it carries one of three honest labels, and a render is never allowed to sit where a building should be:

Standing today. You can walk into it this week.

Work is on site now. Dated photographs, not renders.

Drawn and planned. Honestly labelled as not yet begun.

## Sent In By The People Who Were Here

The best measure of a place is not how it photographs empty. It is what people send back after they leave.

A padel court with the Indian Ocean on the other side of the glass. A house on the ridge with the whole bay underneath it. A pavilion open on three sides where the light comes in flat across the floor at six in the evening and nobody says very much for a while.

The coworking studio is open. The restaurant is serving. The tennis and padel courts are in play. The camp is standing. This is no longer a description of something that will exist.

## Every Week, More People Wake Up Here

Guests book with us through Booking and Airbnb most weeks now. They come for a few nights to an island most of them had never heard of, and what matters to us is that they leave having had a good time. These are the reviews they wrote afterwards, quoted as written.

### A Peaceful Escape with an Exceptional Local Team
